UCSC/FILM + DIGITAL MEDIA DEPARTMENT | |
FILM 196A• SENIOR PROJECTS IN FILM/VIDEO | |
WINTER 2009 |
|
TUESDAY
+ THURSDAY 4:00-6:00pm/ COMM 113 |
Professor:
Irene Gustafson |
|
|||
[syllabus last updated: 24 February 2009] |
|
|||||||||||||||||
In Senior Project Seminar we
will work with HD video to further our cinematic, artistic, collaborative,
conceptual and technical skills. Attendance and participation in class are
essential as we will be working with each other as a production unit, at
times covering a great deal of material, such as students' work or technical
matters, in a very short period of time. If more than two classes are missed
your grade will be affected. The final project will be limited in length to no more than twelve minutes. This is an absolute limit, not open to negotiation. The project can be any genre and style, with a sound track. At the end of the quarter you will be expected to present your film as a completed video on DVD. |
|||||||||||||||||
COSTS: There is a lab feel of $292.00 due for this course. Additionally each student will be responsible for the cost of materials to complete required projects. You are also expected to have a suitable hard-drive for editing. |
|||||||||||||||||
MATERIALS: You are responsible for providing your own digital media storage [CD, DVD-R, External Hard Drive] |
|||||||||||||||||
REQUIREMENTS FOR RECEIVING CREDIT | |||||||||||||||||
Your final evaluation and/or grade in the class will be based on the following: | |||||||||||||||||
• Attendance + Participation | 10% [ongoing: attendance + participation in critique] | ||||||||||||||||
• Script Revisions | 10% [ongoing week 1-5] | ||||||||||||||||
• Final Script | 5% [due Mon. 2/2] | ||||||||||||||||
• Rough Cut | 5% [due week 8] | ||||||||||||||||
• Completed Final Project | 70% [due-- TBA] | ||||||||||||||||
• Attendance
is mandatory; punctuality is required. 3 unexcused absences or excessive
lateness will result in a NO PASS. • All assignments must be completed and turned in on time. All assignments must be completed and turned in to receive credit in the class • Active and thoughtful participation in class discussion and critique is required. • Careful and conscientious handling of equipment/facilities is expected |
|||||||||||||||||
We will be using a class blog to post in-process versions of your scripts. Each student must weekly post recent versions of pre-production materials by the specified times. And relatedly, students are responsible for posting thoughtful critique in a timely manner. LOG IN TO BLOG HERE: http://fdm2.ucsc.edu/blogs/winter09/196a/ |
|||||||||||||||||
The production studios, editing rooms and the classroom are professional production studios used by us and the other production classes. The editing room are shared production spaces as well. Please help to keep them clean. Food and drinks are NOT allowed in Studios or in the editing rooms at any time! We also expect you to follow the rules for equipment checkout and for taking reasonable care of our equipment. | |||||||||||||||||
jump to week: | 1,
|
2, |
3, |
4, |
5, |
6, |
7, |
8, |
9, |
10, |
|||||||
|
...T
January 6th
...TH January 8th 4-5pm:
Operation Staff Orientation •
Treatment + script (ver.1) must be posted to the class on-line site before
FRIDAY 9TH @ 9pm.
|
||||||||||||||||
...T
January 13th • comments + critique must be posted to the class on-line site before WEDNESDAY 14TH @ 9pm
PRODUCTION
WORKSHOP 2: DOLLY + TRACK
|
|||||||||||||||||
|
•
Revised scripts (ver.2) must be posted to the class on-line site before
MONDAY 19TH @ 9pm. ...T
January 20th ...TH
January 22nd • comments + critique must be posted to the class on-line site before WEDNESDAY 21st @ 9pm
|
||||||||||||||||
Revised scripts (ver.3)
must be posted to the class on-line site before MONDAY 26TH @ 9pm ...T
January 27th
comments + critique must be posted to the class on-line site before WEDNESDAY 26TH @ 9pm.
|
|||||||||||||||||
...T
February 3rd • Finalized scripts must be posted to the class on-line site before MONDAY 2nd @ 9pm
|
|||||||||||||||||
...T
February 10th ...TH
February 12th
|
|||||||||||||||||
...T February 17th CONTENT
WORSHOP 4: STUDENT PRESENTATIONS: Defining your "context"
|
|||||||||||||||||
...T
February 24th http://www.mymothersgardenmovie.com/
|
|||||||||||||||||
...T
March 3rd ...TH
March 5h
|
|||||||||||||||||
...T
March 10th
|
|||||||||||||||||
|
|||||||||||||||||
FINAL SCREENING: FRIDAY MARCH 13TH, 2009
|
|||||||||||||||||
|
|||||||||||||||||
FILM + DIGITAL MEDIA RESOURCES: SLUGFILM [checkout, reservation,
facilities]: http://slugfilm.ucsc.edu/ LINDA GARFIELD, operations manager: click here to email 459.2348 CHRIS GUERRERO, digital media specialist: click here to email 459.3512 NICK DULIN, equipment checkout specialist: click here to email 459.3512 ANGIE ROSSI-STEELE, lead digital media specialist: click here to email 459 4242
FILM AND DIGITAL MEDIA WIKI:
http://slugfilm.ucsc.edu/wiki/index.php/Main_Page
|
|||||||||||||||||
OTHER RESOURCES: Porter College Undergraduate Fellowship Award (DUE FEB. 4, 2009)
Property Use Release form [word doc]
Sample Budget [excel doc] Call Sheet [word doc] ITVS Production/Post Forms [from Jade] Storyboard template [jpeg]
FINAL
CUT PRO:
AUDIO: Frequency
handout [word doc]
Build
your own “steadycam”:
|
|||||||||||||||||